Gunite Concrete Pool Construction

After excavation, the pool walls,steps and benches are formed.
Once formed, 5,000 - 6,000 p.s.i. Strength concrete is applied through a hydraulic pump
Stone coping, waterline tile, and plaster are installed on the concrete pool shell.
The pool deck is installed, water is added to the pool and landscaping is completed.
 

905.796.6500